Abbreviations used in Civil Engineering Here some Civil Engineering Abbreviations given below:
A.A.S.H.T.O – American Association of state highway Transport Official.
A.C.I – American concrete institute.
A.R.E.A – American Railway engineering association.
A.S.C – Allowable Stress of concrete.
A.S.T.M – American society for testing materials .
AC – Asbests cement.
AE – Assistant Engineer
APM – Assistant Project Manager
B.M – Bench mark
B.M – Bending moment.
BHK – Bed room,Hall,Kitchen
C.I.Pipe – Cast iron pipe.
C.I.Sheet – Corrugated Iron sheet.
CC – Cement concrete.
CE – Chief Engineer
CP – Cement plaster.
CPM – Critical path method .
CS – Comparative statement.
D.L – Dead load.
DPC – Damp proof course.
DPR – Daily Progress Report
E.L – Environmental load.
EGL – Existing ground level.
ELCB – Earth Leak Circuit Breaker
F.M – Fineness modulas.
FGL – Formation ground level.
GL – Ground Level
GL – Ground level.
GP – Ground plane.
HFL – Highest flood level.
HP – Horizontal plane.
IOM – Inter Office Memo
ISI – Indian standard institute.
JE – Junior Engineer
L.L – Live load.
LC – Lime concrete.
MB – Measurement book.
MCB – Miniature Circuit Breaker
MEP – Mechanical Electrical Plumbing
MFL – Maximum Flood Level
MRC – Material Receipt Challan
MT – Metric Tonnes
NCF – Neat cement finishing.
OGL – Original ground level .
OSR – OPEN SPACE RESERVATION AREA
PCC – Plain Cement Concrete
PERT – Programme Evaluation and Review Technique.
PL – Plinth level.
PM – Project Manager
PO – Purchase Order
PPE – Personal Protective Equipment
PPR – Poly Propylene Random.
PVC – Poly vinyl choloride .
PVC – Polyvinyl Chloride
QC – Quality control
R.B.W – Reinforced brick work.
RBC – Reinforced Brick concrete.
RCC – Reinforced Cement Concrete
RCC – Reinforced cement concrete.
RL – Reduced level.
SCC – Self Compacting Concrete
STP – Sewage Treatment Plant
SWG – Standard wire gauge.
TB – Tie Beam
TDS – Total Dissolved Solids
TMT – Thermo Mechanical Treatment
U.S.C – Ultimate stress of concrete.
UPVC – Unplasticized Poly vinyl choloride.
USD – Ultimate strength design.
VP – Vertical plane.
W.C – Water closet.
W.S.D – Working stress design.
WO – Work Order