Construction Site Preparation

Construction Site Preparation

The Construction Site Preparation site should be surveyed before commencement of the building. Prior to excavation of trenches for foundations, lines are required for marking excavation for foundations termed as setting out the work. After the preparation of designs for foundations, plans for excavation of trenches to receive foundations are prepared to convenient scale. Before starting excavation oftrenches, the centre line of the walls and the width of foundation are to be marked at site.

Construction Site Preparation
Construction Site Preparation

The centre line of one of the longest walls should be marked by stretching the string between two wooden pegs driven at two ends. The centre lines of walls are set out with reference to the above line made in the plan. The pegs should be ๏ฌxed at about 1 metre outside the limits of excavation. The top of all pegs should be in horizontal level irrespective of the level of the ground. All lines at right angles should be ๏ฌxed by” using 3:4:5 method.

The setting out and checking right angles can also be done by using wooden square. For large and important works, instruments like dumpy level/theodolite may be used. The measurement should be made only by using steel. The accuracy of right angles should be checked by measuring the two diagonals from opposite corners which should be equal to each other. If there is any difference, either in the sides or diagonals, the errors are to be neutralised by adjusting the position of the strings of  the pegs.

Small wire nails should be driven at the exact string points on the pegs. On either side of the centre line, the foundation trench lines are marked with a pick-axe. Once lines are marked, the pegs and the strings may be removed.Instead of driving the pegs on the ground, masonry pillars can be built about 1 metre away from the outer edges of excavation with a width of about 300 mm. wider than the foundation trenches. After hacking the lines, the strings stretched on the central points are pressed by a mason’s trowel after applying some cement mortar on the top of the pillars.

Thus the centre line of walls and the outer line of foundation trenches are ๏ฌxed permanently for cross reference during construction work.The first peg has to be driven on the South-West corner of the plot and the other one on the South-East corner with reference to the ๏ฌrst peg; The third side should be at North-West. The fourth side should be at North East.The excavation will be conducted over the entire foundation and the work should be done in layers.

Following construction site peparation To avoid the earth falling into the trenches and for facility of work, the excavated earth should be dumped at a reasonable distance away from the edges of the trench say atleast 1 m. The trenches should be made to the exact length, width and depth and should retain the shape until the foundations are ๏ฌlled up. If the excavation is deep or if the sides are not of hard soil, then the trenches should be supported by shoring either with boards or planks.

The details have not been explained in this book and the sizes and the arrangements of timber to be used depend upon the nature of soil and depth of cutting.Sometimes, the underground water level will be high, and the underground water is met within the foundation trenches.The water should be drained before laying the foundation. A simple method will be by providing drains by the side oftrenches and providing a shallow sump well at one end of the lowest point to collect water from them which can be drawn out by means of pumps or buckets. in some cases, water has to be pumped out and various kinds of pumps are available in the market.

See More Building Design and Construction Handbook

The common tools used for excavation works are pickexes,shovels. spades, crow bars, and in some cases chisels and hammers etc.After the excavation is over, the subgrade shall be cleaned of all injurious matter, watered and rammed. If sand filling is clone, plain concrete should be laid on the sand.Temporary buildings for offices and storage are, to be constructed with non-combustible materials and are to be located preferably on South West corner of the plot. Access for movement of ๏ฌre ๏ฌghting vehicles and equipment shall be provided at the sites.

See More Construction Activities House Construction

Above Construction Site Preparation for detailed described.If any thing feedback give your valuble comments in below.Thank you

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
Follow Engineers

Civil Engineering Job Update in WhatsApp

click on the below link to join
Join Now
close-link
Join over 1000+ Civil Engineers!

Civil Engineering Job Updates in WhatsApp

Daily Civil Jobs Updates click on the below link.
JOIN NOW!
close-link
Worldโ€™s Biggest Cruise Ship Construction Work Checklist Autocad 2d Plan with 3d Elevation