Estimation and Costing

Estimate for proposed Residential Building

Estimate for proposed residential building

 

GROUND FLOOR Specification

 

EARTH WORK

  1. Earth work excavation up to 6′ depth
  2. digging of bore holes for soil stabilization

 

FILLING

  1. Supplying and filling with rier sand
  2. filling bore holes with lime and sand mix 2 : 1

 

Plain Cement Concrete (pcc)

  1. PCCC 1: 4: 8 with 40mm ( 1 1/2″ down graded metal)
  2. Sand lime bed in 2 : 1

 

RCC Works:- including reinforement and centering

  1. Footings with RCC 1: 1 1/2 : 3 up to ground floor
  2. Columns in ground floor in 1 : 1 1/2 : 3

 

RCC work including reinforcement and centering

  1. For Plinth beams in 1 : 2 : 4
  2. For lintel beams in 1 : 2 : 4
  3. for sunshade in 1: 2 : 4
  4. for beams in 1 : 2 : 4
  5. For roof slabs in 1: 2 : 4
  6. For loft slabs in 1: 2 : 4

 

BRICK WORK :  with cement mortar 1 : 5 for 9″ thick walls  in first class brick

  1. Up to ground floor

 

BRICK WORK:-  with cement mortar 1 : 4 for 4 1/2″ thick walls in first class brick with 8mm rod at 4 layer intervel

  1. In ground floor

 

Flooring:-

  1. Flooring with ceramic tiles in 1: 3 cement mortar 13404.00

 

Plastering:-

  1. 1 : 4 cement mortar 1m5mm thick for internal walls and finished to smooth including scaffolding if necessary
  2. 1: 5 cement mortar 15mm thick for external walls including scaffolding
  3. 1: 3 cement mortar 12mm thick for ceiling including scaffolding

 

Paintings

  1. Painting all inner walls with 1 coat primer and 2 coat cement paint
  2. (a) painting all exterior walls with 1 coat primer and

2 coat exterior emulsion

  1. (a) painting all ceilings with 1 coat primer and 2 coat

cement paint

 

Joinery: – (without polishing or painting)

  1. Supplying and fixing of teak wood door in cluding door frame
  2. Supplying and fixing of padac wood door including frame
  3. Supplying and fixing of padac wood window
  4. Supplying and fixing of ventilators and A/C frame

 

Steel joinery

  1. Supplying and fixing of MS flat grill work in windows

 

Anti Termite

  1. Providing and applying of GE silicon sealent around perimeter of windows at 3 mm thick
  2. Rates for plumbing and pipe line excluding fittings
  3. Rates for electrical work in laying of conduits and wiring excluding switches and fittings

 

FIRST FLOOR Specification

 

RCC works:- including reinforement and centering

  1. columns in first floor in 1: 1 1/2 : 3

 

RCC work including reinforcement and centering

  1. for lintel beams in 1: 2 : 4
  2. For sunshade in 1 : 2 : 4
  3. for beams in 1: 2 : 4
  4. For roof slabs in 1 : 2 : 4
  5. for loft slabs in 1 : 2 : 4

 

Brick work:- with cement mortar 1: 5 for 9″ thick walls in  first class brick

  1. First floor to 2 nd floor

 

Brick work: with cement mortar 1:4 for 4 1/2″ thick walls in first class brick, with 8mm rod at 4 layer intervel

  1. In first floor

 

Flooring:-

  1. flooring with marble slabs using 1:3 cement mortar and pointing with white cement

 

Plastering

  1. 1 : 4 cement mortar 20mm thick for internal walls and finished to smootoh including scaffolding if necessary
  2. 1:5 cement mortar 20mm thick for external walls including  scaffolding
  3. 1 : 3 cement mortar 12mm thick for ceiling including scaffolding

 

Paintings

  1. Painting all inner walls with acrylic silk putty and  interior emulsion
  2. (a) painting all exterior walls with 3 coat exterior emulsion

c  (a) painting all ceiling with 1 coat primer and 2 coat cement Paintings

 

Weathering Course

Pressed clay tile in 1:3 mix glove oil 5% by weight of cement over 125mm layer of BJC lime concrete composed of 1 cum of  pure slaked lime of 25mm with 45 angle finish slope (6″ to 4″)(

 

Plaster bands:-

  1. Running of plaster band of 3/4″ projection and 3″ wide all around the exterior in 1:3 mix
  2. running of 25mm wide and 5mm thick grooves in 1:3 MIX

 

Tiles

  1. Supplying and laying of mangalore tile for sloped roof in 1: 3 mix

 

Joinery (without polishing or painting

  1. Supplying and fixing of teak wood door including door frame
  2. Supplying and fixing of padac wood door inclduing frame
  3. Supplying and fixing of padac wood window
  4. Supplying and fixing of ventilators and A/C frames

 

Steel Joinery

  1. Supplying and fixing of MS flat grill work in windows providing overhead tank of 11431 litres capacity with 9″ outer wall in 1 : 3 plaster providing of sump of capacity 12000 litres capacity with rcc walls being water prooofing (including excavation rate) providing of septic tank in RCC for a capacity of 10000 litres without choke pit. Including excavation rate

Laying of paving bloocks in car parking area mention rate in required slope providing of compound wall in 9″ brick wall with plinth beam and piles at regular intervel including plastering and painting in supercem providing and fixing of steel gate

 

 Rates for plumbing and pipe line excluding fittings

Rates for electrical work in laying of conduits and wiring  excluding switches and fittings.

 

Click Here to Download

 

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
Follow Engineers

Civil Engineering Job Update in WhatsApp

click on the below link to join
Join Now
close-link
Join over 1000+ Civil Engineers!

Civil Engineering Job Updates in WhatsApp

Daily Civil Jobs Updates click on the below link.
JOIN NOW!
close-link
World’s Biggest Cruise Ship Construction Work Checklist Autocad 2d Plan with 3d Elevation