Reinforcement

GENERAL POINTS FOR CALCULATIONS OF REINFORCEMENT

 

1. For beam hook= (beam depth-both side

covers)/2
for example if it is a 450mm depth beam then
hook is (450-50)/2=200
where cover for beam is taken as 25 mm
2. For stirrups the hook=4d as per is codes but
according to site conditions it is 50 mm per hook
while doing bar bending schedule.
3. For slab the rod the crank length is l/5.
4. For beam the bottom extra is at l/6.
5. For slab the top extra extends till upto l/3.
6. For beam the top extra bar extends till l/3.
7. The column capitals extends tilll/4.
8. Where l is effective length of the beam. It is
taken as center to center of the
beam.
9. The crank length is 1.41d, where d is (depth

of slab or beam- two side covers)

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
Follow Engineers

Civil Engineering Job Update in WhatsApp

click on the below link to join
Join Now
close-link
Join over 1000+ Civil Engineers!

Civil Engineering Job Updates in WhatsApp

Daily Civil Jobs Updates click on the below link.
JOIN NOW!
close-link
Worldโ€™s Biggest Cruise Ship Construction Work Checklist Autocad 2d Plan with 3d Elevation