Reason for Formwork Design Failure

Reason for Formwork Design Failure

Formwork Designย  mayย  failย  dueย  toย  manyย  reasons.ย  Theย  failureย  primarilyย  occursย  at the time placing of concrete. Some unexpected event may cause one formworkย  memberย  toย  failย  causingย  overloadingย  andย  misalignmentย  ofย  another ย formworkย  member ultimately leading to the collapse of the entire formwork system.

Many such disasters have revealed the root cause of such failure as

1.Excessive loads

2.Premature  removal  of  forms or shores

3.Inadequate lateral support for the shoring members

Improper  Stripping  And  Shore Removal

Prematureย  strippingย  ofย  forms,prematureย  removalย  ofย  shoreย  and careless practices in reshoring can produce catastrophic results. In a case study of a MSB failure, it revealed that a portion of the fourteenthย  floorย  ofย  theย  MSB tower collapsed due to the collapse of the shoring provided toย  supportย  theย  concrete.ย  Itย  appearsย  thatย  theย  shoringย  was weak and the reshores were missing. The collapse of this floor resulted into impact landing of the floor directly below it which also failed and collapsed to the lower floor. This has a domino effect and by the impact load from the weight ofย  upperย  floorย  debris,ย  lowerย  floors ย alsoย  collapsedย  subsequently all in a short span of less than an hour.

Inadequate Lateral Bracing-Wind, Construction Loads Veryย  oftenย  newsย  flasherย  aboutย  formworkย  failures which were induced due to lateral force components or due to displacement of supporting members. Inadequate cross/ horizontal bracing of shores have played a key role in triggering the accidents.

Formwork Design Failure
Formwork Design Failure

High shoring with heavy load at the top is vulnerable toย  eccentricย  orย  lateralย  loading.ย  Whenย  aย  failureย  occursย  in one part, inadequate bracing may induce the collapse to extend to a large portion of the structure and multiply theย  damage. One major objective of bracing is to prevent any minor accident or failure from becoming a disaster.

Ebook to read Site Engineers Manual

Vibration Due To Concrete Placing Equipment

Formย  worksomeย  times ย collapseย  whenย  theirย  supporting shore or jacks are displaced by the vibration caused by passing traffic, the movement of the workers and the equipment on the formwork and the effect of vibratingย  concrete to consolidate it. Some failures have taken place due to the weight of RMC pouring pipe lines and its jerking vi-bration while pumping which has totally been ignored while designing the formwork and shoring.

See More Site Inspection of Concrete formwork

Unstable Soil Under Mudsills, Shoring Not Plumb

Unstable  soil  under  the  mudsills  can  also  cause  the formwork to fail. The mudsills act as a base for a shore or post in a formwork. The mudsills could be a timber plank, a frame, a small footing or pedestals. All loads from formwork are transmitted to the solid ground through vertical members. Shores must be set for plumb on a solid stratum so as to transmit the load axially. Proper care should be taken to drain out the water shed down during rain or during concrete processand shall not allow water to wash away the under stratum soil which may lead to settlement of props.

Related Articles

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
Follow Engineers

Civil Engineering Job Update in WhatsApp

click on the below link to join
Join Now
close-link
Join over 1000+ Civil Engineers!

Civil Engineering Job Updates in WhatsApp

Daily Civil Jobs Updates click on the below link.
JOIN NOW!
close-link
Worldโ€™s Biggest Cruise Ship Construction Work Checklist Autocad 2d Plan with 3d Elevation