Sale!

Complete Cost and Quantity Estimation of Road Work

Original price was: ₹499.00.Current price is: ₹99.00.

Complete Cost and Quantity Estimation of Road Work

Category:

Complete Cost and Quantity Estimation of Road Work

An Example of a Simple Road Construction Estimation is provided here. The breakdown of Simple Road Construction Work is as follows:

  1. EARTHWORK CALCULATIONS FOR ROADWAY
  2. EARTHWORK CALCULATIONS FOR DRAINS
  3. QUANTITY CALCULATIONS FOR GABION RETAINING WALL
  4. Masonry Retaining Structure Quantity Calculation
  5. Masonry Retaining Structure Quantity Calculation
  6. Quantity Estimation of DRAIN
  7. QUANTITY CALCULATION OF COVER FOR SIDE DRAIN
  8. MATRICES OF CROSS-DRAINAGE WORKS
  9. Quantity Estimate of Pipe Culverts
  10. Quantity Estimate of Slab Culverts
  11. QUANTITY CALCULATIONS FOR PAVEMENT
  12. Summary of Rate
  13. RATE ANALYSIS
  14. RATE ANALYSIS FOR MAINTENANCE WORKS
  15. Chart for the collection of materials
  16. Norms for the collection of materials by machine
  17. TRANSPORTATION RATES FOR HAULAGE OF SOIL AT DISPOSAL SITES
  18. Transportation Analysis of Construction Materials
  19. Material Rates
  20. DETAIL QUANTITY ESTIMATE
  21. ABSTRACT OF COST
  22. SUMMARY OF COST

1 review for Complete Cost and Quantity Estimation of Road Work

  1. Jabeer

    How to buy
    Pls send me

Add a review

Your email address will not be published. Required fields are marked *

Back to top button
Follow Engineers

Civil Engineering Job Update in WhatsApp

click on the below link to join
Join Now
close-link
World’s Biggest Cruise Ship Construction Work Checklist Autocad 2d Plan with 3d Elevation