Quotation for Construction of Indoor Badminton Court Design

Quotation for Construction of Indoor Badminton Court Design

Sample Quotation for Construction of Indoor Badminton Court Design for only reference rate can be various place to place.Just for a idea and take out quantity of construction material.

SPECIFICATIONS

MAIN FEATURES: –

  • Structure with a basement height of 1’0” from Natural ground level.
  • Footing pit size 4’x4’x6’-10mm dia @8” c/c main, 8mm dia @8” c/c alternate.
  • Column size – 9”x9” (6 nos 16mm dia and stirrups 8mm dia @8” c/c)
  • Plinth size – 9”x9” (4nos 12mm dia main reinforcement and stirrups 8mm dia @ 8” c/c)
  • Brickwork with good quality chamber bricks using cement mortar 1:6.
  • Basement height 2’-0” Basement inside filling with soil. Above the soil laying PCC 1:4:8 with 40mm blue metal.
  • Plastering with cement mortar 1:4 outside wall.
  • One coat of white cement and two coats of Asian exterior emulsion.
  • Grano flooring with blue metal chips above PCC in the basement.

THE FOLLOWING MATERIALS WILL BE USED: –

  • CEMENT: Dalmia/Ultratech/Ramco
  • BRICKS: Chamber
  • STEEL: ISI
  • SHEET: JSW CCGL0.47
  • PAINT: ASIAN Paint

Total Area of the Building is 54’-0” x 54’-0” = 2916.sq.ft.

Subject: Metal Roofing Shed

‘A’ Truss Length x Width: 58’ Feet x 54’ Feet =3132.Sq. Ft

CLADDING WORK (27’x54’) + (27’x54’) + (30’x54’) + (30’x54’) =6156. Sq. ft

Sub: Fabrication and Erection of conventional steel structure with Cooler coated Galvalume

Sheet fixing at your site – reg With reference to the above subject, we hereby furnish our offer for the above work as under for your kind reference.

Columns: Supply and fixing of 12 Numers.150×100 Columns (MS I BEAM Height 32’ Feet) Columns Base Plates will be of 20 mm thickness 300 mmX300mm & Columns top Plates will be of 8 mm thickness And Guest Assures

Scope of Work Qty Unit Rate Total Value
CIVIL Construction

Work

Supply and

fabrication

installation of

conventional steel

work with Color

coated Galvalume

sheet.

3132 Sft

(Apt)

Sft Rs.160 Rs.5,01,120
Gladding works 6156 Sft Rs.120 Rs.7,38,720 /-
Rolling Shutter 10×6=60(1nos) 60 Sft Rs. 350 Rs.21,000/-
Total Rs.12,60,840

Base foundation 25 mm 1’5’Feet 48 Numbers

Columns Bracing Support ( X 4 Numbers)

Inclusive

A Type Trusses:

Supply and fixing of 4 Numbers. Trusses 54.0” Feet span made up of 50X50mm MS Square Pipe Bottom Rafter as 50X50mm MS pipe with inner cross 30X30 Straight as 30X30 mm pipes medium (ISI 2mm thickness) Lighting Support 1 No Inclusive

Paint Works: One coat of premier & two coats of enamel paint

Roof Sheet: Color coated Galvalume CCGL JSW sheet (0.47mm) and its accessories.

Purlin > 60×40 (ISI 2mm thickness) Square Tube purlin.(1000+1300=1Numbers)

Payment: As per the actual sheet laying measurement.

NOTE:

  • 18% GST Extra.
  • If any other extra work to be carried in the site, the owner should be paid (50% of the
  • extra work amount should be paid in advance).
  • Electrical and water for construction should be arranged by owner.
  • Project duration 45 days from the date of work started.
  • We normally send excess material to the site to cover contingencies. Any material left
  • over will remain our property and we have the right to take it back.

Payment Schedule:

  • 50% in advance along with work order
  • 25% at the basement completion level
  • 20% against delivery of material
  • 5% after completion of work

Synthetic Flooring :

Product Species Thickness Rate/Court Qty Total
Synthetic Badminton

Flooring

Crystal Sand Finish

(GREEN)

4.5 mm Rs. 1,20,000- 2 Rs. 4,40,000/-
Rubber mat Rubber 6.5 mm Rs. 40,000/- 2 Rs. 80,000/-
Total Rs. 3,20,000/-

Terms and conditions:

  1. 18% GST Extra.
  2. Including laying, & Line marking.
  3. Labor travelling & local freight extra.
  4. We normally send excess material to the site to cover contingencies. Any material left over will remain our property and we have the right to take it back.
  • 70% in advance along with work order
  • 20% against delivery of material
  • 10% after completion of work
  1. Warranty would be 5 years from date of installation on conditions applicable regarding to
  2. payments & maintenance.
  3. Our mats are BWF approved and also EN 14904 test passed.

Ebook to Read Civil Engineering Materials

Note: Delivery time for supply of material will be 3 to 4 weeks (Depends upon the stock) from

the date of P.O. and payment.

LED Light:

Product QTY Unit Rate Total
LED Strip type light with panel

(OSRAM LED)

24 No’s 2,500 60,000 /-

Specifications:

  • OSRAM LED Strips will be used (2 strips in a set).
  • 36 Watts, Approx. 400 luminous.
  • Polystyrene prismatic LED diffuser (Anti-glare).

See More Quotation for Building Construction Based on Item rates contract

Terms and conditions:

  • 12% GST extra.
  • 100% advance payment
  • Transportation extra as actual
  • 2 year warranty

Note: Delivery time for supply of material will be 3 to 4 weeks (Depends upon the stock) from

the date of P.O. and payment.

Thanking You

Related Articles

6 Comments

  1. Hi. Raja here from Bangalore, we will provide 7000 sq ft.we need to construct 4 badminton court along with reception, what is the estimated cost of overall project. Send quotation to the below mail id.
    Thanks.

  2. Hi, need to build 2 badminton courts in Trichy. Kindly contact over mail for further specifications.

  3. Hi,
    This is Varun from Hyderabad, looking for a dealer who could construct indoor badminton courts in one of our land of area 3000sft(50×60)*can be extended to 60X60 if required* here in Hyderabad .Hence, would like to have your quotation

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
Follow Engineers

Civil Engineering Job Update in WhatsApp

click on the below link to join
Join Now
close-link
Join over 1000+ Civil Engineers!

Civil Engineering Job Updates in WhatsApp

Daily Civil Jobs Updates click on the below link.
JOIN NOW!
close-link
World’s Biggest Cruise Ship Construction Work Checklist Autocad 2d Plan with 3d Elevation