Thumb rule requirement of standard materials and standard calculation in high raised building
Steel =3 to 5 kg / sft
Cement =.5bags/ sft
RMC =.05 m3/sft
Block =12.5 nos /sqm
Electrical cast = Rs 133/sft
Plumbing cost = Rs 126/sft
Fire fighting cost = Rs 40/sft
External development = Rs 94.5/sft
Civil works-Structure = RS 751.25/sft
Finishing works = RS 467.50/sft
200 mm in cm 1:6 .124Bags /sqm
200 mm in cm 1:4 0.206 bags/sqm
150 mm in cm 1:6 0.093 bags/sqm
150mm in cm 1:4 0.144 bags/sqm
100 mm in cm 1:4 0.103 bags/sqm
Ceiling plastering 0.11 bags/sqm
Wall plastering 0.09 bags/sqm
Rough plastering 0.09 bags/sqm
Duct plastering 0.09 bags/sqm
External plastering 0.175 bags/sqm
lathen plastering 0.55 bags/sqm
stucco plaster 0.175 bags/sqm
100 mm plaster band 0.012 bags/rmt
pcc 1: 4: 8 3.4 bags/cum
pcc 1:5:10 2.52 bags/cum
pcc 1:3:6 4.2 bags/cum
pcc 1:2:4 6.02 bags/cum
230 mm brick 0.876 bags/cum
115 mm brick work 0.218 bags/cum
vdf 100 mm thick 0.82 bags/sqm
granolithic flooring 40 mm 0.35 bags/sqm
granolithic flooring 20 mm 0.28 bags/sqm
anti-skid 0.28 bags/sqm
ceramic 0.28 bags/sqm
vertified tile flooring 0.28 bags/sqm
vertified tile dado 0.27 bags/sqm
cerami dado 0.27 bags/sqm
marble flooring 0.3 bags/sqm
100 mm heigh marble skerting 0.027 bags/rmt
marble glading 0.27 bags/sqm
terracota tle flooring 0.3 bags/sqm
mangalore tile 0.3 bags/sqm
Door frame fixing 0.17 bags/sqm
water proofing for sunken slab 0.23 bags/sqm
water proofing for walls 0.23 bags/sqm
water proofing for balcony/toilets 0.65 bags/sqm
Ant terminate treatment chemical Name is chloropyrifoc 20% . Diluting
5 Lit of Chemical with 95 Lit of water and usage is 7.5 Sqm Per liter {Diluted} .To Provide 1” Dia hole And Deep1Foot.
Labour Productivity:
Brick work 1 mason
1 Men mazdoor 1.25 cm
1 Women Mazdoor
Wall Plastering 1 mason
1 Men mazdoor 10 sqm
1 Women Mazdoor
Ceiling Plastering 1 mason
1 Men mazdoor 8 sqm
1 Women Mazdoor
External Plastering 1 mason
1 Men mazdoor 8 sqm
1 Women Mazdoor
Blockk work 8” 1 mason
1 Men mazdoor 10 sqm
1 Women Mazdoor
Blockk work 6” 1 mason
1 Men mazdoor 8 sqm
1 Women Mazdoor
Blockk work 4” 1 mason
1 Men mazdoor 8 sqm
1 Women Mazdoor
Carpenter 1 Skilled
1 Un skilled 4 Sqm
Bar bender 1 Skilled
1 UN skilled 200Kg
Tile work 1 Mason
1M Mazdoor 10 Sqm
Painter skilled OBD 600 Sft
Emulsion 800 Sft
Putty 600 Sft
Primer 800 Sft
One Sqm=10.763Sft
One Cum=35.314 Cft
One Acres=4046.873 Sqm=43560.17 Sft=4840.019Yards
One Cubic meter = 1000 litere
One Meter=3.280Feet
One Mile =1609.344 meter
One Acre = 100 cent
One ground =2400 Sft=5.51 cent
½ ground =2.75 cent
One Mile =8 Furlong
One cement bag=1.25 Cft
One Forma box =1*1*1.25 feet
External Painting
Ace-Low quality
Apex-Medium Quality
Apex ultima –High Quality