{"id":2596,"date":"2018-04-14T18:33:42","date_gmt":"2018-04-14T13:03:42","guid":{"rendered":"https:\/\/www.onlinecivilforum.com\/site\/?p=2596"},"modified":"2023-02-20T13:37:22","modified_gmt":"2023-02-20T08:07:22","slug":"requirement-of-material-and-labour-for-civil-work","status":"publish","type":"post","link":"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/","title":{"rendered":"Requirement of Material and Labour for Civil Work"},"content":{"rendered":"<h2><strong>Requirement of Material and Labour for Civil Work <\/strong><\/h2>\n<p>The\u00a0 Work\u00a0shall be carried\u00a0out according\u00a0to these Specifications\u00a0whether specifically mentioned elsewhere or not. No extra in any form will be paid unless it is definitely stated as an item in the Bill of Quantities.<\/p>\n<p><strong>Read More<\/strong>\u00a0<span style=\"color: #0000ff;\"><strong><a class=\"row-title\" style=\"color: #0000ff;\" href=\"https:\/\/onlinecivilforum.com\/site\/calculation-of-cement-and-sand-for-plastering-excel-sheet\/\" aria-label=\"\u201cCalculation of Cement and Sand for Plastering Excel Sheet\u201d (Edit)\">Calculation of Cement and Sand for Plastering Excel Sheet<\/a><\/strong><\/span><\/p>\n<p>Whenever the Specifications are not given or when the Specifications are ambiguous, the relevant Nepal\u00a0Standards or Indian\u00a0Standards and\u00a0further amendments will\u00a0be considered as\u00a0final and binding.All Works shall be carried out simultaneously with electrical, plumbing, sanitary and other services and in co-operation with the Contractors of the above services. The Work shall be carried on till it is\u00a0completed satisfactorily along\u00a0with the completion\u00a0 of\u00a0other essential services. \u00a0The building Contractor\u00a0shall keep the other Contractors\u00a0informed of the\u00a0proposed program of\u00a0 Work,\u00a0 well\u00a0 in advance,\u00a0 so that\u00a0the building Work\u00a0 is not\u00a0 hindered.\u00a0 The Contractor shall further cooperate with other\u00a0Contractors in respect\u00a0 of\u00a0 any\u00a0facility required by\u00a0 them\u00a0e.g. making holes\u00a0 in\u00a0 shuttering\u00a0 for sanitary, pipes, electric conduits, fan hook etc. However, no extra payment shall be admissible for such\u00a0reasonable assistance and\u00a0 facilities\u00a0afforded to other\u00a0Contractors and the\u00a0 building Contractors shall\u00a0be deemed to\u00a0 have\u00a0taken these factors\u00a0into consideration while\u00a0 quoting\u00a0 the rates.<\/p>\n<p>The\u00a0 Work\u00a0shall be related\u00a0 to\u00a0the drawings which\u00a0 the\u00a0 Contractor\u00a0is presumed to\u00a0 have\u00a0 studied.Nothing extra will\u00a0 be\u00a0paid for any\u00a0 item\u00a0because of\u00a0its shape,\u00a0 location\u00a0 or\u00a0other difficult circumstances,\u00a0 even\u00a0 if\u00a0 the\u00a0schedule makes no\u00a0 distinction,\u00a0 as\u00a0 long\u00a0as the item\u00a0is shown in\u00a0 the drawings.<\/p>\n<p>The sources of materials stated in the Specifications are those from which materials are generally available. However, materials not conforming to Specifications shall be rejected even if they come from the stated sources. The Contractor should satisfy himself that sufficient quantity of materials of acceptable Specification is available form the stated or other sources.<\/p>\n<p>The requirements of Specifications shall be fulfilled by the Contractor without extra charges i.e. the item rates quoted shall be deemed to have taken these Specifications into account.<\/p>\n<p>These are requirements the Contractor shall fulfil after the issue of Letter of Acceptance but before the Date of Commencement required for construction purpose.<\/p>\n<p>The Contractor shall make his own arrangement for all internal and external telephones and other communication means deemed necessary for the Works.The Contractor shall make his own arrangement for office equipment and other consumable for his use for the Works.<\/p>\n<h2><strong>Safety Measures <\/strong><\/h2>\n<p>The\u00a0Contractor shall be\u00a0responsible for safety\u00a0 of\u00a0all workmen and\u00a0 other\u00a0persons entering the Works and shall at his own expense; where not stated otherwise take all measures, subject to the Engineer&#8217;s approval,\u00a0necessary to ensure their safety.Such measures\u00a0 shall\u00a0 include\u00a0 but\u00a0 not\u00a0 be limited to:<\/p>\n<ul>\n<li>Provision of safety and emergency regulations for fire, gas, and electric shock prevention, together with rescue operation plan.<\/li>\n<li>Safe control of flowing water.<\/li>\n<li>Provision and maintenance of suitable lighting to provide adequate illumination at place of work with appropriate spares and standby unit.<\/li>\n<li>Provision and maintenance of safe, sound slings, pulleys, ropes, and other lifting devices<\/li>\n<li>Provision of safe access to any part of the works.<\/li>\n<li>Provision of\u00a0notices in\u00a0local dialect temporarily\u00a0 or\u00a0permanently during construction\u00a0 at locations likely to be used by the public. Placement of such notices shall depend on the existence of the nature of work in the vicinity. These notices shall be in addition to any other statutory requirements demanded of the Contractor.<\/li>\n<\/ul>\n<p><a href=\"https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work-jpg.webp\"><img decoding=\"async\" class=\"aligncenter size-large wp-image-9684\" src=\"https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work-700x705.webp\" alt=\"Requirement of Material and Labour\" width=\"700\" height=\"705\" srcset=\"https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work-700x705.webp 700w, https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work-jpg-100x100.webp 100w, https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work-jpg-600x604.webp 600w, https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work-298x300.webp 298w, https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work-150x150.webp 150w, https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work-768x774.webp 768w, https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work-jpg.webp 1088w\" sizes=\"(max-width: 700px) 100vw, 700px\" \/><\/a><\/p>\n<h2 style=\"text-align: center;\"><strong>Free Download wait for Count Download\u00a0<\/strong><\/h2>\n<p style=\"text-align: center;\"><button style=\"background: #f77a2c; border-radius: 3px; box-sizing: inherit; color: white; cursor: pointer; font-family: 'Open Sans', Helvetica, Arial, sans-serif; font-size: 0.75rem; font-stretch: inherit; font-style: inherit; font-variant: inherit; font-weight: inherit; line-height: 1; margin: 0px; overflow: visible; padding: 0.6em 1em 0.4em; border: 1px solid initial;\"><a id=\"download\" style=\"background-color: #4caf50; border: none; box-shadow: rgba(0, 0, 0, 0.24) 0px 12px 16px 0px, rgba(0, 0, 0, 0.19) 0px 17px 50px 0px; box-sizing: inherit; color: white; display: inline-block; font-size: 16px; padding: 15px 32px; text-decoration-line: none;\" href=\"https:\/\/mega.nz\/file\/bBQGCaIA#8mnZJLAThvmKLq6yL0C83Cs-1ODaM8vViUwhPmf-upc\">Click Here to Download<\/a><\/button><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Requirement of Material and Labour for Civil Work The\u00a0 Work\u00a0shall be carried\u00a0out according\u00a0to these Specifications\u00a0whether specifically mentioned elsewhere or not. No extra in any form will be paid unless it is definitely stated as an item in the Bill of Quantities. Read More\u00a0Calculation of Cement and Sand for Plastering Excel Sheet Whenever the Specifications are &hellip;<\/p>\n","protected":false},"author":2264,"featured_media":2597,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"two_page_speed":[],"footnotes":""},"categories":[54,26],"tags":[],"class_list":["post-2596","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-design-spreadsheets","category-gendral-civil-engineering"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Requirement of Material and Labour for Civil Work<\/title>\n<meta name=\"description\" content=\"Requirement of Material and Labour for Civil WorkThe\u00a0 Work\u00a0shall be carried\u00a0out according\u00a0to these Specifications\u00a0\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Requirement of Material and Labour for Civil Work\" \/>\n<meta property=\"og:description\" content=\"Requirement of Material and Labour for Civil Work The Work shall be carried out according to these Specifications whether specifically mentioned elsewhere or not. No extra in any form will be paid unless it is definitely stated as an item in the Bill of Quantities.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/\" \/>\n<meta property=\"og:site_name\" content=\"Online CivilForum\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/civilwork\" \/>\n<meta property=\"article:published_time\" content=\"2018-04-14T13:03:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-02-20T08:07:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1366\" \/>\n\t<meta property=\"og:image:height\" content=\"768\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:title\" content=\"Requirement of Material and Labour for Civil Work\" \/>\n<meta name=\"twitter:description\" content=\"Requirement of Material and Labour for Civil Work The Work shall be carried out according to these Specifications whether specifically mentioned elsewhere or not. No extra in any form will be paid unless it is definitely stated as an item in the Bill of Quantities.\" \/>\n<meta name=\"twitter:image\" content=\"https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work.png\" \/>\n<meta name=\"twitter:creator\" content=\"@thomasjbritto\" \/>\n<meta name=\"twitter:site\" content=\"@thomasjbritto\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/requirement-of-material-and-labour-for-civil-work\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/requirement-of-material-and-labour-for-civil-work\\\/\"},\"author\":{\"name\":\"Admin\",\"@id\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/#\\\/schema\\\/person\\\/ccbccea3895033bfa0aa3bc0683d83ef\"},\"headline\":\"Requirement of Material and Labour for Civil Work\",\"datePublished\":\"2018-04-14T13:03:42+00:00\",\"dateModified\":\"2023-02-20T08:07:22+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/requirement-of-material-and-labour-for-civil-work\\\/\"},\"wordCount\":604,\"commentCount\":0,\"image\":{\"@id\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/requirement-of-material-and-labour-for-civil-work\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/Requirement-of-Material-and-Labour-for-Civil-Work.png\",\"articleSection\":[\"Design Spreadsheets\",\"Gendral Civil Engineering\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/requirement-of-material-and-labour-for-civil-work\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/requirement-of-material-and-labour-for-civil-work\\\/\",\"url\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/requirement-of-material-and-labour-for-civil-work\\\/\",\"name\":\"Requirement of Material and Labour for Civil Work\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/requirement-of-material-and-labour-for-civil-work\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/requirement-of-material-and-labour-for-civil-work\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/Requirement-of-Material-and-Labour-for-Civil-Work.png\",\"datePublished\":\"2018-04-14T13:03:42+00:00\",\"dateModified\":\"2023-02-20T08:07:22+00:00\",\"author\":{\"@id\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/#\\\/schema\\\/person\\\/ccbccea3895033bfa0aa3bc0683d83ef\"},\"description\":\"Requirement of Material and Labour for Civil WorkThe\u00a0 Work\u00a0shall be carried\u00a0out according\u00a0to these Specifications\u00a0\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/requirement-of-material-and-labour-for-civil-work\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/requirement-of-material-and-labour-for-civil-work\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/requirement-of-material-and-labour-for-civil-work\\\/#primaryimage\",\"url\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/Requirement-of-Material-and-Labour-for-Civil-Work.png\",\"contentUrl\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/Requirement-of-Material-and-Labour-for-Civil-Work.png\",\"width\":1366,\"height\":768},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/requirement-of-material-and-labour-for-civil-work\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Design Spreadsheets\",\"item\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/category\\\/design-spreadsheets\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Requirement of Material and Labour for Civil Work\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/#website\",\"url\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/\",\"name\":\"Online CivilForum\",\"description\":\"Online Civilforum based recruitment news site that aims to spread the construction knowledge to all over the World.\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/onlinecivilforum.com\\\/site\\\/#\\\/schema\\\/person\\\/ccbccea3895033bfa0aa3bc0683d83ef\",\"name\":\"Admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/cdf45ee29d77ef3d29bfff6e0c7a02774edc163b7d650db08ea7ffabd5deffba?s=96&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/cdf45ee29d77ef3d29bfff6e0c7a02774edc163b7d650db08ea7ffabd5deffba?s=96&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/cdf45ee29d77ef3d29bfff6e0c7a02774edc163b7d650db08ea7ffabd5deffba?s=96&r=g\",\"caption\":\"Admin\"},\"description\":\"My name is Thomas Britto.I am a civil engineer from India.I know there were many people who struggle for information during graduation or after seeking their job.I have started this website for providing basic knowledge and New technologies which were implementing all over the world. we will definitely provide valuable information for you all. stay connected and Follow us on other social media platforms. Thank you !\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Requirement of Material and Labour for Civil Work","description":"Requirement of Material and Labour for Civil WorkThe\u00a0 Work\u00a0shall be carried\u00a0out according\u00a0to these Specifications\u00a0","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/","og_locale":"en_US","og_type":"article","og_title":"Requirement of Material and Labour for Civil Work","og_description":"Requirement of Material and Labour for Civil Work The Work shall be carried out according to these Specifications whether specifically mentioned elsewhere or not. No extra in any form will be paid unless it is definitely stated as an item in the Bill of Quantities.","og_url":"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/","og_site_name":"Online CivilForum","article_publisher":"https:\/\/www.facebook.com\/civilwork","article_published_time":"2018-04-14T13:03:42+00:00","article_modified_time":"2023-02-20T08:07:22+00:00","og_image":[{"width":1366,"height":768,"url":"https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work.png","type":"image\/png"}],"author":"Admin","twitter_card":"summary_large_image","twitter_title":"Requirement of Material and Labour for Civil Work","twitter_description":"Requirement of Material and Labour for Civil Work The Work shall be carried out according to these Specifications whether specifically mentioned elsewhere or not. No extra in any form will be paid unless it is definitely stated as an item in the Bill of Quantities.","twitter_image":"https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work.png","twitter_creator":"@thomasjbritto","twitter_site":"@thomasjbritto","twitter_misc":{"Written by":"Admin","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/#article","isPartOf":{"@id":"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/"},"author":{"name":"Admin","@id":"https:\/\/onlinecivilforum.com\/site\/#\/schema\/person\/ccbccea3895033bfa0aa3bc0683d83ef"},"headline":"Requirement of Material and Labour for Civil Work","datePublished":"2018-04-14T13:03:42+00:00","dateModified":"2023-02-20T08:07:22+00:00","mainEntityOfPage":{"@id":"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/"},"wordCount":604,"commentCount":0,"image":{"@id":"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/#primaryimage"},"thumbnailUrl":"https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work.png","articleSection":["Design Spreadsheets","Gendral Civil Engineering"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/","url":"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/","name":"Requirement of Material and Labour for Civil Work","isPartOf":{"@id":"https:\/\/onlinecivilforum.com\/site\/#website"},"primaryImageOfPage":{"@id":"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/#primaryimage"},"image":{"@id":"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/#primaryimage"},"thumbnailUrl":"https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work.png","datePublished":"2018-04-14T13:03:42+00:00","dateModified":"2023-02-20T08:07:22+00:00","author":{"@id":"https:\/\/onlinecivilforum.com\/site\/#\/schema\/person\/ccbccea3895033bfa0aa3bc0683d83ef"},"description":"Requirement of Material and Labour for Civil WorkThe\u00a0 Work\u00a0shall be carried\u00a0out according\u00a0to these Specifications\u00a0","breadcrumb":{"@id":"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/#primaryimage","url":"https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work.png","contentUrl":"https:\/\/onlinecivilforum.com\/site\/wp-content\/uploads\/2018\/04\/Requirement-of-Material-and-Labour-for-Civil-Work.png","width":1366,"height":768},{"@type":"BreadcrumbList","@id":"https:\/\/onlinecivilforum.com\/site\/requirement-of-material-and-labour-for-civil-work\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/onlinecivilforum.com\/site\/"},{"@type":"ListItem","position":2,"name":"Design Spreadsheets","item":"https:\/\/onlinecivilforum.com\/site\/category\/design-spreadsheets\/"},{"@type":"ListItem","position":3,"name":"Requirement of Material and Labour for Civil Work"}]},{"@type":"WebSite","@id":"https:\/\/onlinecivilforum.com\/site\/#website","url":"https:\/\/onlinecivilforum.com\/site\/","name":"Online CivilForum","description":"Online Civilforum based recruitment news site that aims to spread the construction knowledge to all over the World.","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/onlinecivilforum.com\/site\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/onlinecivilforum.com\/site\/#\/schema\/person\/ccbccea3895033bfa0aa3bc0683d83ef","name":"Admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/cdf45ee29d77ef3d29bfff6e0c7a02774edc163b7d650db08ea7ffabd5deffba?s=96&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/cdf45ee29d77ef3d29bfff6e0c7a02774edc163b7d650db08ea7ffabd5deffba?s=96&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/cdf45ee29d77ef3d29bfff6e0c7a02774edc163b7d650db08ea7ffabd5deffba?s=96&r=g","caption":"Admin"},"description":"My name is Thomas Britto.I am a civil engineer from India.I know there were many people who struggle for information during graduation or after seeking their job.I have started this website for providing basic knowledge and New technologies which were implementing all over the world. we will definitely provide valuable information for you all. stay connected and Follow us on other social media platforms. Thank you !"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/onlinecivilforum.com\/site\/wp-json\/wp\/v2\/posts\/2596","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/onlinecivilforum.com\/site\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/onlinecivilforum.com\/site\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/onlinecivilforum.com\/site\/wp-json\/wp\/v2\/users\/2264"}],"replies":[{"embeddable":true,"href":"https:\/\/onlinecivilforum.com\/site\/wp-json\/wp\/v2\/comments?post=2596"}],"version-history":[{"count":0,"href":"https:\/\/onlinecivilforum.com\/site\/wp-json\/wp\/v2\/posts\/2596\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/onlinecivilforum.com\/site\/wp-json\/wp\/v2\/media\/2597"}],"wp:attachment":[{"href":"https:\/\/onlinecivilforum.com\/site\/wp-json\/wp\/v2\/media?parent=2596"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/onlinecivilforum.com\/site\/wp-json\/wp\/v2\/categories?post=2596"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/onlinecivilforum.com\/site\/wp-json\/wp\/v2\/tags?post=2596"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}